Labour tuning: a tour

This video is coming soon

The written steps below already work. Come back to watch it.

A tour of Labour tuning in Arkon One: Design labour estimates compared with real timesheet hours, to tune the productivity rates (minutes per component). and the controls you will use most.

The steps, written out

  1. Open Labour tuning from the Engineering and 3D Designer section of the left menu.
  2. Read the summary tiles at the top: Jobs compared, Median actual ÷ estimate, Estimate error (RMS), Rates in force.
  3. Read each row: Job, Designs, Estimated erect (h), Actual erect (h), Actual ÷ estimate, Dismantle est. / actual (h).
  4. Review the Estimated vs actual hours per job section.
  5. Review the Suggested scaling section.
  6. Review the Per component type (least squares) section.

Tip

Open Labour tuning (Engineering → Labour tuning; Owner / Administrator, Office Manager, Engineer). It compares each job's estimated erect hours with the real Erect timesheet hours logged on that job (rejected timesheets are ignored).