How to link a scaffold to its drawing or record that it matches the latest revision

This video is coming soon

The written steps below already work. Come back to watch it.

How to link a scaffold to its drawing or record that it matches the latest revision. Owner / Administrator, Office Manager, Engineer / Document Control, Foreman and Safety Inspector can do this.

The steps, written out

  1. Open Drawing check and find the scaffold (use All scaffolds or No drawing linked).
  2. In its last column pick the drawing (the job's Drawing, Shop drawing, PE-stamped design or As-built documents are offered).
  3. After checking the scaffold against the latest issued revision, press Built to latest. The scaffold now records that revision as Built from.

Tip

If the job has no drawings you see "No drawings for this job". The scaffold's own page also has the Drawing and Built from revision fields.