Crew & timesheet rules: a tour
The written steps below already work. Come back to watch it.
A tour of Crew & timesheet rules in Arkon One: Certifications required per task type, and the clock-in geofence and the controls you will use most.
The steps, written out
- Open Crew & timesheet rules from the People and Payroll section of the left menu.
- Review the Certifications required per work-order type section.
- Review the Extra certifications by scaffold type section.
- Review the Clock-in geofence section.
Tip
Defaults: Erect, Modify and Dismantle need Scaffold Erector/Dismantler and OSHA 10 for everyone assigned; Inspection and Post-storm inspection need Scaffold Competent Person for at least one person; Hoist install needs Hoist Operator; Repair and Hurricane prep need OSHA 10. Swing-stage, mast-climber and hoist scaffolds add their own cards. Crew & timesheet rules has three cards: When someone captures GPS at clock-in, the system measures the distance to the job's location. If it is more than the allowed distance (300 m by default) the entry is flagged Outside site with the distance; otherwise it shows On site. Entries without GPS show No GPS.