How to add, pause or delete an inspection rule
How to add, pause or delete an inspection rule. A step-by-step walkthrough of the screens, buttons and fields involved.
The steps, written out
- Open Inspection rules.
- In Add rule choose the Rule; for Every N days set the days (1–90).
- Choose Applies to. For a scaffold type also pick Scaffold type; for a job pick the Job (otherwise "Choose the scaffold type for this rule" or "Choose the job for this rule").
- Optionally pick a Template and add Notes, then press Add rule.
- A new rule does not change existing due dates by itself: press Recalculate due dates to apply the active rules to every standing scaffold.
- Use Pause / Activate or Delete in the table. Check weather alerts now runs the bad-weather check immediately; it also runs every night.