Start free trial

Productivity: a tour

A tour of Productivity in Arkon One: Units completed per hour worked. Hours come from the timesheets. and the controls you will use most.

The steps, written out

  1. Open Productivity from the Field and Safety section of the left menu.
  2. Read the summary tiles at the top: Units per hour, Units completed, Hours worked, Reports.
  3. Narrow the list with the search box and filters (From, To, Location).
  4. Switch to the By person tab.
  5. Switch to the By crew tab.
  6. Use the Daily reports button at the top of the page.
  7. Review the People section.