Work orders: a tour
A tour of Work orders in Arkon One: Erection, modification, dismantle and repair work — scheduled, tracked and billed and the controls you will use most.
The steps, written out
- Open Work orders from the Field and Safety section of the left menu.
- Read the summary tiles at the top: Today, In Progress, Open & scheduled, Labour hours this month.
- Narrow the list with the search box and filters (Search work orders…, status, wo_type, foreman_id).
- Read each row: WO #, Type, Job, Scaffold, Status, Priority.
- Use the List button at the top of the page.
- Use the Week button at the top of the page.
- Use the Board button at the top of the page.
- Use Export to download the list as a spreadsheet or PDF.
Tip
All three look at the last 90 days: Field & Safety → Work orders (Work orders) lists erection, modification, dismantle and repair jobs for crews. Switch between List, Week (foreman lanes by day) and Board. The tiles show Today, In Progress, Open & scheduled and Labour hours this month. Filters: search, Status, Type, Foreman, Job and dates; Export works on the list. Statuses: Without a job and description you get "Job and description are required". A foreman scheduled for today is notified.