Start free trial

Work orders: a tour

A tour of Work orders in Arkon One: Erection, modification, dismantle and repair work — scheduled, tracked and billed and the controls you will use most.

The steps, written out

  1. Open Work orders from the Field and Safety section of the left menu.
  2. Read the summary tiles at the top: Today, In Progress, Open & scheduled, Labour hours this month.
  3. Narrow the list with the search box and filters (Search work orders…, status, wo_type, foreman_id).
  4. Read each row: WO #, Type, Job, Scaffold, Status, Priority.
  5. Use the List button at the top of the page.
  6. Use the Week button at the top of the page.
  7. Use the Board button at the top of the page.
  8. Use Export to download the list as a spreadsheet or PDF.

Tip

All three look at the last 90 days: Field & Safety → Work orders (Work orders) lists erection, modification, dismantle and repair jobs for crews. Switch between List, Week (foreman lanes by day) and Board. The tiles show Today, In Progress, Open & scheduled and Labour hours this month. Filters: search, Status, Type, Foreman, Job and dates; Export works on the list. Statuses: Without a job and description you get "Job and description are required". A foreman scheduled for today is notified.