12-week forecast: a tour
A tour of 12-week forecast in Arkon One: Reserved, scheduled and quoted demand vs. stock by week and the controls you will use most.
The steps, written out
- Open 12-week forecast from the Operations section of the left menu.
- Read the summary tiles at the top: Items short on confirmed demand, Short if quotes are won, Open quote lines counted.
- Narrow the list with the search box and filters (item_id).
- Read each row: Nov 13, Nov 20, Nov 27, Dec 4, Dec 11, Dec 18.
- Use the Availability check button at the top of the page.
- Use Export to download the list as a spreadsheet or PDF.
- Review the RL-L2 · Ringlock ledger 2.07 m (6'10") section.
- Review the Projected available by week (incl. open quotes) section.
Tip
12-week forecast shows, for every item and each of the next 12 weeks, the projected available quantity: stock now, minus scheduled deliveries, sales, reservations and re-rents going back to vendors, plus scheduled returns, and also counting open quotes.