Scaffold map: a tour
A tour of Scaffold map in Arkon One: 114 scaffolds · 93 standing and the controls you will use most.
The steps, written out
- Open Scaffold map from the Operations section of the left menu.
- Read the summary tiles at the top: Green tag, Yellow tag, Red tag, Overdue inspections, Not standing.
- Narrow the list with the search box and filters (Tag #, location, job…, job_id, area_id, status).
- Read each row: Tag #, Job, Area, Location on site, Type, Status.
- Use the Map button at the top of the page.
- Use the List button at the top of the page.
- Use the Scan tag button at the top of the page.
- Use Export to download the list as a spreadsheet or PDF.
Tip
On the design Overview open Hand-off → Scaffold records and press Create scaffold records (Owner / Administrator, Office Manager, Engineer, Sales). Each structure becomes a scaffold record on the job, with type, height, length, lifts, tie count, duty rating and the drawing revision. They start as Planned when a revision is issued, otherwise Requested. See them in the scaffold map. The QR token is created automatically, and an "Erected" entry is added to the history when you enter an Erected date. The button is shown to Owner / Administrator, Office Manager, Foreman, Safety Inspector / Competent Person and Engineer. To have a new structure built, raise an Erect service request instead and the scaffold is created as Requested. Operations → Scaffold map (Scaffold map) shows every scaffold as a pin: green, yellow or red tag, or gray when nothing is standing (requested, scheduled, dismantled). A ⚠ marks an overdue inspection. Click a pin for details.