Start free trial

Shoring: a tour

A tour of Shoring in Arkon One: Load per leg versus allowable capacity for every shoring layout and the controls you will use most.

The steps, written out

  1. Open Shoring from the Operations section of the left menu.
  2. Read the summary tiles at the top: Layouts, Active (not stripped), Awaiting removal sign-off, Over 85% utilised.
  3. Read each row: Layout, Job, Shore type, Design load (psf), Spacing, Load / leg.
  4. Use the New layout button at the top of the page.

Tip

The layout page calculates the Tributary area per leg (X x Y), the Load per leg (design psf x tributary area), the Utilisation (load / allowable capacity), the capacity ratio and, with an area, the legs required against the legs provided. It is a schematic check only: follow the engineer's stamped drawing. On Shoring the utilisation bar is load per leg divided by allowable leg capacity. The capacity ratio is the inverse (capacity / load) compared with the Required capacity ratio: Shoring can only be stripped after the engineer of record approves the removal. Until then the layout shows Awaiting engineer sign-off and cannot be marked Stripped (it stays at its previous status, or Poured).