How to record a modification to a scaffold

This video is coming soon

The written steps below already work. Come back to watch it.

How to record a modification to a scaffold. A step-by-step walkthrough of the screens, buttons and fields involved.

The steps, written out

  1. Open the scaffold and find Record modification under Scaffold actions.
  2. Describe what changed (required: "Describe the modification"), for example "Added 2 lifts on the north return".
  3. Leave Require re-inspection before use (sets yellow tag, due today) ticked unless the change needs no re-inspection.
  4. Press Record modification.

Tip

The scaffold moves to Modification in progress, the date is stored as its last modification, a new handover becomes required, and Safety Inspectors are notified. Every modification needs a new signed handover before the scaffold can go back to Standing – safe. A completed Modify work order does the same automatically.