Start free trial

Hoists & equipment: a tour

This video is coming soon

The written steps below already work. Come back to watch it.

A tour of Hoists & equipment in Arkon One: Personnel & material hoists, swing stages, mast climbers and shoring systems on site and the controls you will use most.

The steps, written out

  1. Open Hoists & equipment from the Operations section of the left menu.
  2. Read the summary tiles at the top: Units on site, Inspections due, Certificates expiring, Out of service.
  3. Read each row: Install #, Equipment type, Job, Status, Next inspection, Certificate expiry.
  4. Switch to the On site & planned tab.
  5. Switch to the Planned tab.
  6. Switch to the Installed tab.
  7. Switch to the In Service tab.
  8. Use the Shoring button at the top of the page.
  9. Use the New install button at the top of the page.
  10. Review the Installed units section.
  11. Review the Wind watch section.
  12. Review the Inspections due section.
  13. Review the Expiring certificates section.

Tip

Hoists & equipment tracks the powered access equipment installed at job sites: personnel/material hoists, swing stages (suspended platforms), mast climbers, shoring tower systems and trash chutes. Each installation has an Install # (EQ-xxx), job, status, next inspection and certificate expiry. Only the Owner / Administrator, Office Manager, Dispatcher, Yard Manager and Engineer can create or edit installations. You can link serial numbers later from the install page (Link assets). - Planned - scheduled but not on site yet.