Hoists & equipment: a tour
The written steps below already work. Come back to watch it.
A tour of Hoists & equipment in Arkon One: Personnel & material hoists, swing stages, mast climbers and shoring systems on site and the controls you will use most.
The steps, written out
- Open Hoists & equipment from the Operations section of the left menu.
- Read the summary tiles at the top: Units on site, Inspections due, Certificates expiring, Out of service.
- Read each row: Install #, Equipment type, Job, Status, Next inspection, Certificate expiry.
- Switch to the On site & planned tab.
- Switch to the Planned tab.
- Switch to the Installed tab.
- Switch to the In Service tab.
- Use the Shoring button at the top of the page.
- Use the New install button at the top of the page.
- Review the Installed units section.
- Review the Wind watch section.
- Review the Inspections due section.
- Review the Expiring certificates section.
Tip
Hoists & equipment tracks the powered access equipment installed at job sites: personnel/material hoists, swing stages (suspended platforms), mast climbers, shoring tower systems and trash chutes. Each installation has an Install # (EQ-xxx), job, status, next inspection and certificate expiry. Only the Owner / Administrator, Office Manager, Dispatcher, Yard Manager and Engineer can create or edit installations. You can link serial numbers later from the install page (Link assets). - Planned - scheduled but not on site yet.