Labour budget alerts: a tour
A tour of Labour budget alerts in Arkon One: Running jobs whose labour cost is close to or past the labour on the quote and the controls you will use most.
The steps, written out
- Open Labour budget alerts from the Operations section of the left menu.
- Switch to the Open tab.
- Switch to the Dismissed tab.
- Use the Check all jobs now button at the top of the page.
- Review the Jobs to look at section.
- Review the Settings section.