How to log an inspection, load test, repair or certification on an installation
This video is coming soon
The written steps below already work. Come back to watch it.
How to log an inspection, load test, repair or certification on an installation. A step-by-step walkthrough of the screens, buttons and fields involved.
The steps, written out
- Open Hoists & equipment and press Log on the unit (or open it and press Log inspection; New entry in the log card).
- Choose the Log type: Daily inspection, Load test, Service, Repair, Wire rope inspection, Overspeed test or Certification.
- Set the Date and Performed by (both required).
- For a Daily inspection mark every item of the checklist Pass, Fail or N/A (swing stages and mast climbers: wire ropes, stirrups, motors, brakes, tie-backs, outrigger counterweights, lifeline, rope grabs; hoists: mast sections, gate interlocks, landing gates, rack & pinion, brakes, overspeed device, limit switches, base enclosure).
- Add Readings / measurements (for example the load-test weight or rope diameter) and Notes, and sign.
- Press Save log.
Tip
Any failed item makes the entry Fail and takes the unit Out of Service. A pass sets the Next inspection due, Last load test (Load test) or the Certificate expiry one year ahead (Certification). The Owner / Administrator, Office Manager, Safety Inspector, Foreman, Crew Member and Yard Manager can log entries.